From 2003 to 2006Project Activities
Section III: Taizz – Aden (153 km):
- Reconnaissance and Feasibility Study
- Topographic Survey based on Aerial Photogrammetry
- Strategic Design
- Design Standards
- Traffic Surveys
- Traffic Forecast
- Geotechnical and Hydrological Study
- Economic Evaluation
- Preliminary Design
- Final Design and Tender Documents.
Contact
Dorsch International Consultants GmbH
München (Headquarters)
80687 München
Germany
Phone: +49 89 5797-0
Fax: +49 89 5797-800
E-Mail: info@dorsch.de
Description
The objective of this project is to build an additional dual carriageway connecting the main towns along the axis Taizz – Aden.
The purpose of the new dual carriageway is to enhance this vital north-south communication link, to improve safety of the users, to remove bottlenecks and therefore to reduce time of travel between Aden, Sana`a and Amran. This is a strategic policy developed by the government of Yemen to facilitate the development of the whole country. Within the scope of this project Dorsch was retained to provide Consultants´ Services for the Feasibility Study and Detailed Engineering Design.