Bangkok: The Extension of MRTA Network, 3 projects

DORSCH CONSULT, together with a multi-national consortium, has awarded the contract to conduct a Feasibility Study, EIA, Preliminary Design, Detailed/Definitive Design and Tender Documents for the three  projects with a total length of 71 km.  The three projects comprise of:

  1. Blue Line Extension Project 

    • Hua Lamphong – Bang Khae Section, with total length of 14 km. (9 km Elevated Section and 5 km Underground Section) comprises 10 stations (6 Elevated stations and 4 Underground stations)
    • Bang Sue – Tha Phra Section, with total length of 13 km. (all elevated) comprises 7 stations

  2. Orange Line Project, Bang Kapi – Bang Bumru Section, with total length of 24 km. (3 km Elevated Section and 21 km Underground Section) comprises 17 stations (2 Elevated stations and 15 Underground stations)
  3. Purple Line Project, Bang Yai – Ratburana Section, with total length of 20 km. (6 km Elevated Section and 14 km Underground Section) comprises 16 stations (5 Elevated stations and 11 Underground stations)

Services

Transport and Infrastructure

Companies

DC Asia

Client

Mass Rapid Transit Authority of Thailand

Duration

From 2005 to 2006

Contact

Juergen Supik