Successful Under River Crossing of Chao Phraya River at MRTA Project in Bangkok

07.01.2015

Breakthrough of Tunnel Boring Machine at MRTA-Blue Line Project

Bangkok, Thailand (15 Dec. 2014)

Tunnel Boring Machine (TBM) breaks through at MRTA Sanam Chai Station presently being constructed following the first under river crossing (Chao Phraya River) for the MRTA Blue Line Extension Rail Project.

Dorsch Consult Asia, Ltd. is a Joint Venture Partner with the Project Management Consultants.

Contact

Dorsch Consult asia Co., Ltd.

E-Mail: dcasia(at)dorsch.co(dot)th
Fon: + 66 (0) 2 679 8900
Fax: + 66 (0) 2 679 8995